The Irrigation Department has been entrusted with the construction of a reservoir for storing water to be used in Gampaha, Attanagalla, Minuwangoda Integrated Water Supply Scheme which is implemented by NWSDB. The project proponent is NWSDB and the target population of 250,000 in Gampaha District will be served by the project with treated pipe borne water.

The project area falls in two administrative districts; Gampaha and Kegalle and spans over 6 Grama Niladari Divisions, which are located in Attanagalla Divisional Secretary Division of Gampaha District and in Ruwanwella Divisional Secretary Division of the Kegalle District. The dam is proposed to build at village called “Karasnagala” across Basnagoda Oya which is a tributary of Attanagalu Oya.

The contract value of the project is 2.347 billion Sri Lankan Rupees and the contract period is 18 months. The parties involving in the project is as follows;

Employer Ministry of Irrigation
Implementing Agency Irrigation Department
Funding Agency Ministry of Water Supply / National Water Supply & Drainage Board
Contractor Sinohydro Corporation Limited

Technical Details of the Project

Dam  
GPS coordinates LB 134153 E      212274 N
Maximum Height 20.3 m
Crest Length 136.5 m
Bund width 5 m
Type C20 Fine Aggregate Concrete Masonry Gravity Dam
Reservoir  
Capacity 5.51 MCM
Catchment area 37.6 km2
Area inundated at FSL 65 Ha
Area inundated at HSL 76 Ha
Full Supply Level 45.73 MSL
Dam Top Level 48.74 MSL
High Flood Level 46.90 MSL
Minimum operating Level 34.00 MSL
Reservoir bed level 28.18 MSL
Spillway  
Radial Gates 3.29 m x 6.0 m
No. of gates 3
Weir Type WES Weir

Contact

(Eng.) R.D.A. Deshapriya
Project Director
+94 332 280 960 / +94 332 280 968
+94 773 621 374 / +94 718 277 635
+94 332 280 968
This email address is being protected from spambots. You need JavaScript enabled to view it.