The Irrigation Department has been entrusted with the construction of a reservoir for storing water to be used in Gampaha, Attanagalla, Minuwangoda Integrated Water Supply Scheme which is implemented by NWSDB. The project proponent is NWSDB and the target population of 250,000 in Gampaha District will be served by the project with treated pipe borne water.
The project area falls in two administrative districts; Gampaha and Kegalle and spans over 6 Grama Niladari Divisions, which are located in Attanagalla Divisional Secretary Division of Gampaha District and in Ruwanwella Divisional Secretary Division of the Kegalle District. The dam is proposed to build at village called “Karasnagala” across Basnagoda Oya which is a tributary of Attanagalu Oya.
The contract value of the project is 2.347 billion Sri Lankan Rupees and the contract period is 18 months. The parties involving in the project is as follows;
Employer | Ministry of Irrigation |
Implementing Agency | Irrigation Department |
Funding Agency | Ministry of Water Supply / National Water Supply & Drainage Board |
Contractor | Sinohydro Corporation Limited |
Technical Details of the Project
Dam | |
GPS coordinates | LB 134153 E 212274 N |
Maximum Height | 20.3 m |
Crest Length | 136.5 m |
Bund width | 5 m |
Type | C20 Fine Aggregate Concrete Masonry Gravity Dam |
Reservoir | |
Capacity | 5.51 MCM |
Catchment area | 37.6 km2 |
Area inundated at FSL | 65 Ha |
Area inundated at HSL | 76 Ha |
Full Supply Level | 45.73 MSL |
Dam Top Level | 48.74 MSL |
High Flood Level | 46.90 MSL |
Minimum operating Level | 34.00 MSL |
Reservoir bed level | 28.18 MSL |
Spillway | |
Radial Gates | 3.29 m x 6.0 m |
No. of gates | 3 |
Weir Type | WES Weir |